Getting Started

Our Pool Construction Process

We work with homeowners to design the perfect pool for their lifestyle.

LAYOUT
The pool design is laid out on the ground for the client to view.

FORM
Upon approval of the layout, construction begins. Wood framing is installed to the outside dimension of the pool shape for excavation.

EXCAVATION
Excavation equipment is brought in to dig the pool.

STEEL
Reinforcement bars are placed within the walls and floor with accuracy in order to strengthen and support the concrete structure.

GUNITE
American Concrete approved nozzle men will apply a dry mix gunite to the walls and floor of the pool. When completed the shape is very visible.

PLUMBING
Rigid PVC piping is laid in the trenches. Proper hydraulics are designed in advance for maximum efficiency and optimum flow.

ELECTRIC
Electrical and gas work will follow after plumbing.

MASONRY
Coping, tile and interior finishes that are available to view in our showroom are now completed.

COMPLETION
Start up and then orientation. At this time we can answer any question you may have with regard to operation.

SERVICE AFTER COMPLETION
This is the most critical point in your overall construction. Service MUST commence as soon as the interior finish is completed in order to protect your investment.